Construction is Underway!

We will continue to update this page as progress is made. We have raised 90% of the funds needed to complete this phase of the project. Please consider making a donation to help us reach the finish line!

 

November 1, 2017

 

The construction team continues to make exciting progress on the new residence building. The exterior walls are now up, the roof is on, and as you can see from the images below, the front entrance has been framed and details are being applied.

roof 2 carpenters working on the front face and entrance. Uniteing technology with tradition.jpg

As with the rest of the work at Deboche, everything is still being done by hand. The wooden entrance to the building, which reflects the traditional architecture of the region, was carved by the carpenters on site. The front steps, like all the blocks from which the building is constructed, were also cut by hand on site.

Here you can see more clearly the work on the front entrance to the residence, as well as the architectural detail on the window trim. The tent behind the building is used as a carpentry shop, where the carving takes place. In many ways this project is a labor of love for all involved.

As the weather turns colder, it's more important than ever to redouble our efforts to finish up the exterior and begin work on the inside of the building, so that the nuns will have a warm, safe environment in which to spend the winter. 

roof 1 adding the carved wooden entrance.jpg

 

October 1, 2017

We are delighted to be able to share the latest photos showing progress on the new nuns' residence. As you can see below, the first story exterior blocks are now in place, and the second story teaching/meditation space is beginning to take shape. Workers continue their labor by hand, cutting stone, laying blocks, framing windows and doors. interior framing is also in place. All work is being done under the watchful eye of Mingma Tenzin, who shared these photos.

Oct 1 progress on 2nd story.jpg

Front of the new residence hall showing real progress made in September.

Oct 1 walls nearing roof line.jpg

View from the rear. The roofing trusses are in place over the section of the building that will house the nuns.

 
 

 

September 1, 2017

These are heady days.

Deboche is buzzing with activity under the watchful eye of Project Coordinator Migma Tenzin Sherpa. Thirty workers are on site. The foundation for the new residence has been laid, door and window framing is being put into place, and the courses of stone for the walls are being laid. Work is being done carefully, but as quickly as possible, so that the nuns will have a habitable residence before the onset of winter.

 
Sept 1 walls progressing.jpg
Sept 1 intigrating the framing into the walls.jpg
Oct 1 working toward the second story.jpg

Beams are in place for the second story.

Oct 1 Window frame ready to be installed.jpg

A worker poses with framing for an upper story window.

Oct 1 tea break.jpg

A welcome tea break on a cool autumn day.

 
Sept 1 foundation is being finished we have 30 workers on this project.jpg
Sept 1 Windows and doors framing being set in place.jpg

 

As we await the next stream of photos from Mingma, we ask again for your help in finishing the project. We don't want to let the workers go before everything is done. We've come so far...from the first efforts to bring the nuns clean water, provide a rudimentary kitchen and some insulation in the sleeping quarters...to teaming with Architects Without Borders to design the new building...to facing the aftermath of the 2015 earthquakes...to finally seeing our dreams become reality. Please visit our You Can Help page and donate to help us reach the finish line!  


 
P1 Dorme and Mingma discuss plans 2.jpg

Mingma Tenzin, Project Coordinator, and Dorme, general contractor, go over construction plans.

F5 workers hauling sand up slippery mountain side.jpg

Harvesting sand for concrete on slopes prone to landslides.

P7 worker forging metal.jpg

A worker forges metal stakes over a wood fire.

P16 the stone cutters 2.jpg

Stonecutters shape foundation blocks. Each can produce about three blocks a day.

Summer 2017

We are extremely excited to announce that construction has finally begun on the new nuns’ residence at Deboche. It has, indeed, been a long and tenuous journey... through challenging fundraising efforts, navigating the process of attaining non-profit status in both the US and Nepal, facing the devastating damage done by earthquakes, and coordinating the efforts of teams half a world away from each other. Mingma Tenzin, our Project coordinator, has been sending the photos you see here of workers shaping stone, carpenters hand hewing timbers, the foundation being dug out by hand, and the cement being poured. Our dream is finally becoming a reality. This reality is, in great measure, due to the incredible efforts of MIngma Tenzin and of Laura Rose and her design team at Architects Without Borders who have continually updated the designs and engineering plans required to meet the ever-changing and challenging demands of the harsh environment of the Everest region. Click here to view the latest updates  to the construction drawings.

t1 challenging monsoon weather 2.jpg

Work is complicated by the challenging weather. The carpentry shop is under cover.

T11 porters arriving with wood for the project 2.jpg

Construction materials are stored as they arrive on site.

It may be difficult for some to imagine tackling a sizeable construction project when modern technology is not available. The new residence hall is being built with no power tools and without a single construction vehicle or earth moving machine. In the Khumbu region of Nepal where Deboche is located there are no roads, so the building site is inaccessible to heavy equipment. 

 

Transport of building materials is a fragile, choreographed effort in a season during which days are most often filled with fog and rain from the summer monsoon. Helicopters loaded with building supplies fly low beneath the clouds, which gives the pilots limited visibility before landing on a small airstrip above the Sherpa capital of Namache. From there every tool and all materials must be carried on the backs of porters through the challenging Himalayan ascents on treacherous, slippery terrain to their final destination at Deboche.

 

F12 foundation wall and cornor post with reinforcement bar.jpg

Foundation wall in place with rebar.

Upon arrival the lumber, bags of cement, tools, and steel and iron reinforcing bars must be secured under tarps for protection against the storms that continuously plague the high Himalaya. Shelters for the workers, dining tents and work spaces must be constructed. Just imagine 400 bags of cement being carried up thousands of feet of altitude on someone’s back, wrestling boulders weighing many tons by human power alone, harvesting bags of sand in dangerous landslide areas, and stone blocks having being hauled on back-boards to stone cutters who will shape three stones a day sitting under the dubious protection of a tarp strung between two trees.

 

This is construction Himalayan style!

 

It is almost incomprehensible to our western minds that this monumental effort by a workforce of over 50 men will produce a building within 3 to 4 months. But when completed, this building with its eco-conscious design and the adaptation of seismic construction techniques will provide a safe, warm and protective shelter, a new kitchen and dining room, modern sanitary facilities and beautiful spaces for study and practice for both the resident nuns and those visiting from other convents. It will also provide a place to gather and celebrate Tibetan/Sherpa culture and Buddhist traditions for the people living within the Everest region. And most importantly, it will renew, revitalize and celebrate a special place realized long ago as one of the most sacred places in the Nepal Himalaya.


C3 head monk performing puja 2.jpg

The head monk representing the Abbott at the Tengboche monastery presides over the dedication ceremony

With the help of private donors, corporate funding and support from Architects Without Borders, Dan Mazur and SummitClimb, Altruistic Odyssey and a most generous grant from the Pema Chodron Foundation, we have been able to fund the construction of the new building at Deboche. As we celebrate this new beginning for Deboche, we are still in need of funds to finish the interior spaces of the convent. Please consider making a contribution to help us with the completion of this important work. On behalf of the Board of Directors, our Sherpa friends in the Khumbu, the village of Deboche and its surrounding neighbors and, most importantly, the Anis of the Deboche Convent, we are grateful for your kind consideration of this request.